Well, two 12 hr+ days and we have basic functionality of most systems, although there are issues with routing and email. Ah well. Tomorrow we tackle those. With any luck, by Monday morning we will have everything relocated except the secondary systems that require major antenna/telco/other installations, and those should be done within a month or so. We are even going through the old office and disconnecting all of the added power taps and such so that the new tenants won't be drawing off of our battery backup units - we will need those to power the remaining critical systems in case of a power failure.